Rainbow + ODEcalc + CurvFit Software 4 Engineers & Scientists
Reg. $0.00

Fortran Calculus - Ordinary Differential Equations
Reg. $1,000,000.00


1. FC Advance Order Form


2. Feedback Form
How did installation & execution proceed for user?


Scientific & Engineering Productivity

Sample of Track Record in Industry
    (Since 1968)

Rapid Solution to New problems

  • Antenna Design Beam Synthesis (Hughes): 3 weeks vs. 6 months
  • Laser System Design Balancing (Ford Aeroneutronic): 3 days vs. ???
  • Steam Power Electric Network (Bechtel Corp): 1/80 Cost of Benchmark
  • Radial Tire Design (Goodyear): 1 day vs. 6 months
  • Space Telescope Mirror (Rockwell): 2 days - proposal support
  • Electric Motor Design Optimization (Sierracin/Magnedyne): 1 day vs. ???
  • Optical System Optimization (TRW): (3 wks & $2.4K) vs. (6 mos & $50K)
  • Airport Noise Optimization (Wyle Labs): 1 day vs. ???
  • Electrical Filter Design (Memorex): 1 week vs. 12 weeks

<< Back

 
Copyright © 2005 Optimal Designs Enterprise. All rights reserved.