|
|
|
Scientific & Engineering Productivity
Sample of Track Record in Industry
Rapid Solution to New problems
- Antenna Design Beam Synthesis (Hughes):
3 weeks vs. 6 months
- Laser System Design Balancing (Ford Aeroneutronic):
3 days vs. ???
- Steam Power Electric Network (Bechtel Corp): 1/80 Cost of Benchmark
- Radial Tire Design (Goodyear): 1 day vs. 6 months
- Space Telescope Mirror (Rockwell): 2 days - proposal support
- Electric Motor Design Optimization (Sierracin/Magnedyne): 1 day vs. ???
- Optical System Optimization (TRW): (3 wks & $2.4K) vs. (6 mos & $50K)
- Airport Noise Optimization (Wyle Labs): 1 day vs. ???
- Electrical Filter Design (Memorex): 1 week vs. 12 weeks
|
|
|